CHUBUT WIND FARMS – ARGENTINA

Client
Nordex Acciona Windpower

Scope
Preliminary study of seismic hazard for 2 Wind Farms in Argentine territory.

Power

Description
Based on the seismic hazard maps of the Argentine territory, as well as in its INPRES-CIRSOC local code, the loads that control the design of 2 Wind Farms are analyzed and set in the preliminary study stage.

Location
Chubut, Argentina.

Year
2016

Date

24 November, 2016

Leave a Reply

Your email address will not be published. Required fields are marked *