FISCAL BRIDGE

Client
Sacyr Chile S.A.

Scope
Structural design based on dynamic analysis and Seismic Isolation according to AAHSTO 2010 standard.

Lenght
180 m

Height
13.5 m

Description
5 spans of 36 m long each. Deck made by  presstressed concrete girders of 1.86 m height, supported by seismic isolators HDRB type.

Location
La Serena – Vallenar Highway, La Serena, Chile

Year
2015

Date

18 November, 2016

Leave a Reply

Your email address will not be published. Required fields are marked *