‘Seismic Isolation’ Category

November 25 2016

CONFLUENCY BRIDGE

Client Codelco VP Chile Scope Structural design based on dynamics analysis. Lengh 154 m Height 29 m Description 3 spans between 36 and 47 m long. Composite deck made by 4 double T girders supported...

November 19 2016

TES VIADUCT

Client Sacyr Chile S.A. Scope Structural design based on dynamic analysis and Seismic Isolation according to AASHTO 2010 standard. Lenght 150 m Height 22 m Description 3 Spans of 50 m long each....

November 19 2016

EL DURAZNO VIADUCT

Client Sacyr Chile S.A. Scope Structural design based on dynamic analysis and seismic isolation according to AASHTO 2010 standard. Lenght 130 m Height 28.5 m Description Composite deck made by 4 continuous steel girders...

November 19 2016

LA PAULA VIADUCT

Client Sacyr Chile S.A. Scope Structural desing based on dynamic analysis and seismic isolation according to AAHSTO 2010 standard. Lenght 140 m Height 30 m Description Composite deck made by 4 continuous steel girders...

November 19 2016

LOS BOSQUES VIADUCT

Client Sacyr Chile S.A. Scope Structural design based on dynamic analysis and Seismic Isolation according to AASHTO 2010 standard. Lenght 150 m Height 34 m Description 3 Spans of 50 m long each. Composite...

November 19 2016

ALCAPARROSA VIADUCT

Client Sacyr Chile S.A. Scope Structural design based on dynamic analysis and Seismic Isolation according to AAHSTO 2010 standard. Lenght 220 m Height 56 m Description 5 continuous Spans with lengths between 40...

November 18 2016

FISCAL BRIDGE

Client Sacyr Chile S.A. Scope Structural design based on dynamic analysis and Seismic Isolation according to AAHSTO 2010 standard. Lenght 180 m Height 13.5 m Description 5 spans of 36 m long each. Deck...

November 18 2016

JUAN SOLDADO BRIDGE

Client Sacyr Chile S.A. Scope Structural design based on dynamic analysis and Seismic Isolation according to AAHSTO 2010 standard. Length  160 m Heigth 35.5 m Description 4 spans of 40 m long each....

August 26 2016

HUASCO BRIDGE

Client Sacyr Chile S.A. Scope Advanced conceptual design of 3 alternatives: Steel Arc, Concrete Arc and Hibrid Arc. Lengh 200 m (108 m central span) Height 30 m Description Double Steel arch with floating deck on...

August 25 2016

AMERICO VESPUCIO VIADUCT

Client Sacyr Chile S.A. Scope Structural desing based on dynamic analysis and seismic isolation according to AASHTO 2010 standard. Lengh 184 m Height 6 m Description Deck girders supported by seismic isolators...