‘Structures’ Category

September 6 2016

JUSTICE CENTER OF SANTIAGO BUILDING

Client Ghisolfo Consultant Engineering. Scope Inspection and structural retroffiting of Access Stairs and Shear Walls, damged by the earthquake on February 2010. Description Reinforcement of Stairs supports and repair of cracking in...

September 6 2016

RETROFITTING OF AMÉRICO VESPUCIO BRIDGE

Client GESVIAL Scope Repair damages caused by earthquake on February 2010. Description 2 spans 25 m long each. Repair of postensioned girdes and  concrete cracking . Replacement of expansion joints, vertical anchorages...

September 6 2016

SAN JUAN CEMENT PLANT

Client Cementos San Juan Scope Structural review of footings of Cement Silos.  Designer: Cobra Chile. Description Main Silo Cement, Extra Cement Silo, Filthy Building. Location San Antonio, Chile Year 2008

September 6 2016

RETROFITTING OF CENTENNIAL BRIDGE

Client Sacyr Chile Scope Tensional analysis through 3D Model of the new cantilevers under design traffic. Description Structural Reinforcement of Cantilevers with Near-Surface-Mounted  CFRP. Award of Merit ICRI 2009 (International Concrete Repair...

August 26 2016

CHIMNEYS – MEJILLONES POWER PLANT

Client Foster Wheeler Chile Scope Analysis of dynamic wind effects on 2 Steel Industrial Chimneys. Assesment of drag force  due to spoilers according to ESDU method. Assesment of damping taking into account soil...

August 26 2016

DERRICK – COKE UNIT

Client Foster Wheeler Chile Scope Dynamics analisys and seismic reinforcement of the Derrick. During the Earthquake on February 27, 2010, this structure suffer several damage and was near to collapse. It is...

August 26 2016

HUASCO BRIDGE

Client Sacyr Chile S.A. Scope Advanced conceptual design of 3 alternatives: Steel Arc, Concrete Arc and Hibrid Arc. Lengh 200 m (108 m central span) Height 30 m Description Double Steel arch with floating deck on...

August 26 2016

“DEPARTAMENTAL” ELEVATED GUIDEWAY

Client Constructora Necso-Sacyr Chile. Scope Infraestructure design based on dynamics analysis. Lengh 338,4 m Height 10 m Location Santiago, Chile Year 2004

August 26 2016

RAMADILLAS BRIDGE

Client Constructora Ruta 160 Scope Structural design based on dynamics analysis. Lengh 280 m Height 10 m Description 8 Spans between 35 and 37 m long. Deck made by 4 prestressed girders supported by seismic isolators...

August 26 2016

“EMBALSE LA CIGUEÑA” BRIDGE

Client Estructuras Viales S.A. Scope Infrastructure desing based on dynamics analisys. Lengh 200 m Height 21 m Description 5 spans 40 m long each. Deck made by 4 presstressed girders of 2.26 m heigth....