‘Structures’ Category

November 20 2016

CONVEYOR 2 BRIDGE

Client Zañartu ADM Planning Scope Structural review and design of Foundations. This structure is part of the Project named New Mine Level of Codelco. Lenght 198 m Height 30 m Description 4 continuos span...

November 20 2016

CRANE BRIDGE EXTENSION

Client Besalco Constructions Scope Extension of the crane bridge support, located into the Valves house. Capacity 12.5 Tons Location Ancoa Reservoir, Linares, Chile Year 2016

November 20 2016

TASTING BUILDING

Client Amec Foster Wheeler Chile Scope Modification of Maintenance platforms, 3D dynamic model update and review of BRB seismic behavior (Buckling Restrainded Braces). Height 39 m Location Molybenum concentrate treatment Plant, Hualpén, Chile...

November 19 2016

FLUE GAS STEAM GENERATOR

Client Amec Foster Wheeler Chile Scope Seismic certification of equipment and its support structure, according to NCh2369-2003 Chilean code. This certification was requested by ENAP Bio Bio. Height 33 m Location Enap Refinerias...

November 19 2016

IBAÑEZ BRIDGE

Client Sacyr Chile S.A. Scope Structural desing based on cinematic and dynamic analysis. Lenght 80 m Height 15 m Description Semi – Integral bridge, made by 4 spans of 20 m long each....

November 19 2016

MARGA MARGA II BRIDGE

Client ACS – Sacyr Chile S.A. Scope Structural consulting at the construction stage. Lenght 450 m Height 60 m Description 9 spans 50 m long each. Deck made by prestressed girders of 2.5 m...

November 19 2016

TES VIADUCT

Client Sacyr Chile S.A. Scope Structural design based on dynamic analysis and Seismic Isolation according to AASHTO 2010 standard. Lenght 150 m Height 22 m Description 3 Spans of 50 m long each....

November 19 2016

EL DURAZNO VIADUCT

Client Sacyr Chile S.A. Scope Structural design based on dynamic analysis and seismic isolation according to AASHTO 2010 standard. Lenght 130 m Height 28.5 m Description Composite deck made by 4 continuous steel girders...

November 19 2016

LA PAULA VIADUCT

Client Sacyr Chile S.A. Scope Structural desing based on dynamic analysis and seismic isolation according to AAHSTO 2010 standard. Lenght 140 m Height 30 m Description Composite deck made by 4 continuous steel girders...

November 19 2016

LOS BOSQUES VIADUCT

Client Sacyr Chile S.A. Scope Structural design based on dynamic analysis and Seismic Isolation according to AASHTO 2010 standard. Lenght 150 m Height 34 m Description 3 Spans of 50 m long each. Composite...