IBAÑEZ BRIDGE

Client
Sacyr Chile S.A.

Scope
Structural desing based on cinematic and dynamic analysis.

Lenght
80 m

Height
15 m

Description
Semi – Integral bridge, made by 4 spans of 20 m long each. Currently, this bridge is the longest structure of its type in Chile.

Location
Cabrero, Concepción, Chile

Year
2015

Date

19 November, 2016

Leave a Reply

Your email address will not be published. Required fields are marked *