CHUBUT WIND FARMS – ARGENTINA
Client
Nordex Acciona Windpower
Scope
Preliminary study of seismic hazard for 2 Wind Farms in Argentine territory.
Power
Description
Based on the seismic hazard maps of the Argentine territory, as well as in its INPRES-CIRSOC local code, the loads that control the design of 2 Wind Farms are analyzed and set in the preliminary study stage.
Location
Chubut, Argentina.
Year
2016
Date
24 November, 2016